Superintendent's Information

Line Item Run Down of Completed Work
Cleared 44 Acres of trees
Hand Cleared-Underbrush 34 acres
Earthwork Built 7 lakes
Moved 365,000 cubic yards of soil
Drainage  
Installed Drain Pipes 7 1/2 miles
Set Catch Basins/Drain Inlets 160
Greens  
Built 167,700 square feet
Pipe under greens 5 miles (approx)
Tees  
Built 250,000 square feet
Pipe for drainage 1 1/4 miles
Tees per hole Five
Grassing  
When completed 150 acres
Cart paths Six miles (concrete)
Sand traps 100,000 sq. feet/2,250 tons of sand
Bridges 740'
Irrigation $1.1 Million system